 INDEPENDENT CHECKING ENGINEERS

Project Title : Sg. Selangor Phase 3 Project (SSP3)
Client : Gamuda-KEDB-TSWA JV
Services provided : Design Review and Construction Monitoring, Due Diligent Assessment of Bukit Badang Treatment Plant
Project Description : SSP3 consists of :
•  110m high clay core rockfill embankment with a storage capacity of    235MCM, diversion tunnel, spillway structures and outlet works.
•  A 250 MLD capacity treatment works, raw and treated pumping station,    32 ML balancing reservoirs and pipelines.
•  A 800 MLD capacity treatment works, raw water and treated water    pumping station and a 82ML balancing reservoir.

 

Project Title : SMART Project
Client : Gamuda - MMC JV
Services provided : Design Review & Construction Monitoring
Project Description : The SMART project was implemented to alleviate the flooding problems in Kuala Lumpur by diverting flood water from Sg Klang upstream of Kuala Lumpur City centre and discharging it into Sg Kerayong. The project involves:
•  a flood by-pass tunnel of 11.8m diameter and 9.7 km in length through    Karstic Limestore formation.
•  a double deck motorway approximately 3 km long in the by-pass    tunnel with ingress and egress links.

 

Project Title : Duplex Board Factory
Client : Bank Pembangunan Malaysia Bhd.
Services provided : Design Review & Construction Monitoring
Project Description : The project owner, CHH Pacific Paper Sdn Bhd, obtained a loan from the Bank Pembangunan Malaysia Berhad to construct a Duplex Board factory at the Bentong, Pahang. The value of the construction works is RM45 million. ACS is the ICE for the project.

 

Project Title : Langkasuri Resort (PHASE 1), Pantai Tengah, Langkawi
Client : Langkasuri Sdn. Bhd.
Services provided : Design Review & Construction Monitoring
Project Description : ACS was appointed ICE for the project by Langkasuri Sdn Bhd involves construction of 32 bungalow hotels and 12 chalets at Pantai Tengah Langkawi, Kedah. Bank Perusahaan Kecil & Sederhana Malaysia Berhad (SME) is the lender for this project.

 

Project Title : 2nd Phase Development of the Port of Tg Pelepas, Johor
Client : Bank Pembangunan Malaysia Bhd.
Services provided : Contract Review & Construction Monitoring
Project Description : The Port of Tanjung Pelepas (PTP) is a container port located on the eastern month of Sg. Pulai, Johor. The port has naturally deep harbour with a draft of 15 to 19 metres. Its turning basin of 600 metres allows ships of any size to turn easily. The port began operation on 10 October 1999 and establish a world record as the fastest growing port . By 2003 it handled 3.87 million TEU, and becomes Malaysia 's largest port. In 2004 it is the world's 16th busiest container port. ACS is the ICE for the project.



Project Title : Privatisation cum Concession for Sg. Semenyih Scheme
Client : Konsortium ABAS
Services provided :  
Project Description : ICE Services include.
•  Dam safety and status review for Semenyih dam,
•  Due diligent assessment of Semenyih treatment plant
•  Design review for a river monitoring system, a chlorine scrubber    system and a sludge treatment plant
•  Review and monitoring of construction activities, testing and    commissioning of installation works.
The role of the ICE for the project calls for expertise in hydrology, hydraulic, geotechnical, dam engineering, treatment plant and water distribution works.